Launch Day
The countdown is at T-00:10, the press is at the gate and the fuel hose is still connected. SPACE-B at its busiest.

Cutting the pieces…
A bridge and a tower behind, a banana skin in front and a dinosaur in the warehouse. Two floors of wide-angle chaos.
Concept drawing. Not the final illustration of the printed puzzle.
The countdown is at T-00:10, the press is at the gate and the fuel hose is still connected. SPACE-B at its busiest.
A helicopter on the roof, green foam in the lab and crates about to topple in the warehouse. A different mishap on every level.
The cafeteria is full, the control room is busy and the rocket is waiting in its scaffold. Who is doing what in the crowd?
Your language, theme, cart and game progress are stored in this browser; the site cannot work without them. If you allow it, we count visits with Umami on our own server. Cookie policy